1. Dust removal system operation
2. When the elevator is opened, it drives the separator to open.
3. Open the screw conveyor.
4. Hook 1. Hang the workpiece in the cleaning room, raise it to a certain height, and stop it after contacting the travel switch.
5. Hook 1 enters the clean room and stops at the preset position.
6. The door of the cleaning room is closed, and the hook 1 starts to rotate.
7. Shot blasting machine open
8. Start cleaning after the steel shot supply door is opened.
9. Hook 2. Hang the workpiece in the cleaning room, raise it to a certain height, and stop it after contacting the travel switch.
10. Hook 1: The hung workpiece is removed and the shot feeding gate is closed.
1. Shot blasting machine stops running
12. Hook 1 stops
13. Open the door of the cleaning room and move the hook 1 out of the cleaning room.
14. Hook 2 enters the clean room and stops when it reaches the preset position.
15. The door of the cleaning room is closed, and hook 2 starts to rotate.
16. Shot blasting machine open
17. Open the steel shot supply door and start cleaning.
18. Hook 1 unloads the workpiece outside the cleaning room
19. The workpiece hung by hook 2 is removed, and the shot feeding gate is closed.
20. Shot blasting machine stop
21. Hook 2 rotates and stops.
22. The door of the cleaning room is opened, and hook 2 goes out of the cleaning room.
23. To continue working, please repeat steps 4-22.