First, before starting the shot blasting machine, we need to check whether the lubrication of all parts of the equipment meets the regulations.
Second, before the formal operation of the shot blasting machine equipment, it is necessary to check the wear of vulnerable parts such as guard plates, rubber curtains, and spokes, and replace them in time.
Third, we also need to check whether there is any sundries in the equipment falling into the machine. If there is, please clear it in time to prevent blockage of each conveying link and cause equipment failure.
Fourth, check the fit of the moving parts, whether the bolt connection is loose, and tighten it in time.
Fifth, before starting the machine, only when it is confirmed that there is no one in the room and the inspection door is closed and reliable, it can be ready to start. Before starting the machine, a signal must be sent to make the people near the machine leave.